Sep
7
2010

Part 1 Production is Wrapped

The L.A. pickup shots have been completed!  Many thanks to the incredible cast and crew who have been so generous with their time over the past 10 months.  We have generated over 150 hours of footage (a lot for a narrative feature) and involved over 150 actors (a lot for a lower buget film) in two countries.  Parallel to the post-production of Part 1, we will likely commence production for Part 2 in January, assuming funding is in place.  There will be another round of  casting for supporting roles at that time.  We currently have two openings for internships beginning in October (assistant editor and admin assistant).  There will be an informational meeting at 7:30pm on October 5th.

May
11
2010

Honduras

La Prensa de Honduras, 13 Abril 2010

Feb
25
2010

Garifuna in Peril (a play by Bill Flores)

A subplot of the first film follows a group of young people putting on a play about Chief Joseph Satuyé, the paramount chief of the Garinagu on the island of St. Vincent.

Dec
20
2009

Dance Show Photos

This dance show (produced by Georgette Lambey and Martha Martinez) will be featured in the movie along with the play “Garinagu in Peril”.

Nov
16
2009

Production Photos